Tell Us the Job. We'll Tell You What to Buy.

Plain-language guides for the jobs people actually call us about — what material, how deep, how many yards, and how to do it.

Most people do not ring a materials supplier knowing they want three yards of #57. They ring because water is sitting in the yard, or the driveway has gone to mud, or the side of the house is a mess.

These guides start from the job rather than the product. Pick the one that matches what you are doing and it will tell you what to order, how much of it, and how to get it right.

One cubic yard to a thousand loads

There is no truckload minimum here. One cubic yard is a normal order — enough for a fire pit surround or a small bed — and we will bring it with the same care as a commercial delivery.

At the other end we run 20+ tri-axle loads a day onto development sites. Same company, same phone number. See commercial and development.

Choose your project

Not on the list?

Call and describe it. We would far rather spend two minutes on the phone working out what you need than have you order the wrong thing and find out when it is already in a pile on your driveway.

(954) 692-6352 · Mon–Fri 6 AM–6 PM, Sat 7 AM–1 PM

Timing the work around the weather

South Florida has two seasons that matter to anyone moving material, and planning around them is worth real money.

Wet season, roughly May to October

Afternoon storms are close to daily and they are heavy. Three practical consequences:

  • Ground goes soft fast. A site that carried a loaded truck on Monday may not on Wednesday. A tri-axle raising its bed puts enormous load through the rear axles, and we would far rather drop on firm ground near the road than bury a truck on your lot.
  • Compaction gets harder. Base and fill compact best at near optimum moisture. Saturated material pumps under a roller instead of densifying, and no amount of extra passes fixes it.
  • Uncovered piles absorb water. Topsoil and fine sand are worst affected — a soaked pile is significantly harder to spread. Tarp anything that will sit more than a day or two.

Dry season, roughly November to April

Better ground, easier compaction, and the busiest construction period of the year — which means pits and trucking are in higher demand and lead times stretch. Book earlier than you would in August.

The exception is asphalt millings, which want heat. Millings laid and rolled in June bind within days; the same load in January can take weeks and may need re-rolling.

Hurricane season, June through November

Two effects. Before a storm, demand for rip rap and shoreline protection spikes and everything gets tight. Afterwards, cleanup and repair work absorbs regional trucking capacity for weeks.

If your project involves shoreline protection, do it in the spring. Trying to armour a seawall with a named storm in the forecast is how people end up paying premium rates for whatever stone is left.

Working out how much you need

Material is sold by the ton. Plans are drawn in cubic yards. That mismatch is where most ordering errors come from, and they are expensive in both directions — running short stops a crew, and over-ordering by a large margin ties up money in a pile.

The arithmetic: multiply length by width by depth in feet, divide by 27 to get cubic yards, then multiply by the material's weight per yard. Most rock runs about 1.35 to 1.4 tons per cubic yard; compacted base is heavier at roughly 1.65; topsoil is lighter at about 1.15.

Then allow for compaction. Base and fill lose roughly 20 to 25 percent of their loose volume once they are properly compacted, so the tonnage you order should be above the theoretical plan volume. Our tonnage calculator builds that allowance in and converts the answer into truckloads.

Order slightly heavy. Two extra tons in a pile costs almost nothing and always gets used. Two tons short on a Friday afternoon costs you a whole extra delivery and a crew standing around.