Same-Day & Next-Day Delivery
SE & SW Florida
1 Yard Minimum
Owner-Operated
Home/Service Area/Sarasota
Service Area

Gravel & Aggregate Delivery in Sarasota County

Sarasota, Venice and North Port — one of the fastest-growing corners of the state.

Distance from yard
185 – 205 miles
Route
I-75 via Alligator Alley
Pricing
Call for pricing
Minimum delivery
1 cubic yard

Sarasota County is roughly a hundred and eighty-five to two hundred and five miles from our yard — among the longest runs we make, comparable to the middle Keys.

Cities we deliver to in Sarasota County

Ground conditions in Sarasota County

Sarasota County spans a mature, affluent coastal strip and an inland area growing about as fast as anywhere in Florida.

Coastal versus inland

Sarasota and Venice are established, design-conscious and renovation-driven — hardscape, landscape and pool work. North Port and the eastern county are new construction at scale, which means fill, base and driveways in volume.

Sandy ground

Soils through much of the county are sandier than the thin-cap-over-limestone profile of the southeast coast. That drains well but offers less inherent bearing, so compaction discipline matters and fill sand moves steadily under slabs and pads.

Standards

Sarasota in particular maintains a high standard of residential landscape and hardscape finish. Stone colour and consistency are noticed here in a way they are not on an industrial yard.

Choosing the right material

Most ordering mistakes are not quantity errors — they are the wrong material bought for the job. This is the short version of what goes where.

If the job is…UseNotWhy
Base under pavement, inspectedLimerock baseShell rockSpec work needs the certified bearing value. Shell rock will not satisfy LBR 100.
Base under pavement, not inspectedCrushed concreteVirgin limerockPerforms at or near limerock, gains strength over time, costs less.
Driveway, pad or ranch roadShell rockSpec limerockNobody is testing the bearing value. Put the saving into thickness.
Driveway wearing surfaceAsphalt millingsLoose stoneBinds in the sun into a firm dark surface that does not wash out or dust.
French drain or drainfield#57 rockCrusher runWashed and open-graded, so water moves through it. Anything with fines clogs.
Under pavers — beddingWashed concrete sandMason sand or stone dustOnly well-graded coarse sand locks under load. One inch, screeded.
Permeable paver bedding#89 rockConcrete sandPermeable systems are a different detail — open-graded stone, not sand.
Mortar, play areasMason sandConcrete sandFine and uniform, so it trowels smoothly and is soft underfoot.
Raising grade under a slabFill sandFill dirtDrains freely and compacts predictably. Dirt holds moisture and moves.
Landscape grade, bermsFill dirtFill sandCheaper per ton, and bearing capacity is not the concern.
Under new sodTopsoilFill dirtFill is deliberately low in organics. Sod on fill declines once it exhausts what it arrived with.
Pool deck, path, bordersPea rock#57 rockRounded and smooth underfoot. Angular stone is uncomfortable and looks harsh.
Seawall, shoreline, scourRip rapAnything smallerStone has to be heavy enough that design-storm flow cannot move it.

Not sure? Call and describe the job. We would rather spend two minutes on the phone than deliver the wrong thing.

Timing the work around the weather

South Florida has two seasons that matter to anyone moving material, and planning around them is worth real money.

Wet season, roughly May to October

Afternoon storms are close to daily and they are heavy. Three practical consequences:

  • Ground goes soft fast. A site that carried a loaded truck on Monday may not on Wednesday. A tri-axle raising its bed puts enormous load through the rear axles, and we would far rather drop on firm ground near the road than bury a truck on your lot.
  • Compaction gets harder. Base and fill compact best at near optimum moisture. Saturated material pumps under a roller instead of densifying, and no amount of extra passes fixes it.
  • Uncovered piles absorb water. Topsoil and fine sand are worst affected — a soaked pile is significantly harder to spread. Tarp anything that will sit more than a day or two.

Dry season, roughly November to April

Better ground, easier compaction, and the busiest construction period of the year — which means pits and trucking are in higher demand and lead times stretch. Book earlier than you would in August.

The exception is asphalt millings, which want heat. Millings laid and rolled in June bind within days; the same load in January can take weeks and may need re-rolling.

Hurricane season, June through November

Two effects. Before a storm, demand for rip rap and shoreline protection spikes and everything gets tight. Afterwards, cleanup and repair work absorbs regional trucking capacity for weeks.

If your project involves shoreline protection, do it in the spring. Trying to armour a seawall with a named storm in the forecast is how people end up paying premium rates for whatever stone is left.

How ordering works

There is no account to open and no portal to log into. You tell us the material, the tonnage, the site address and when you need it on the ground, and we come back with a locked, all-in delivered price — usually within the hour during business hours.

That price includes the haul. We quote delivered, not ex-pit, so the number we give you is the number on the invoice. If you are comparing quotes, check whether the other one has trucking in it.

What we need from you

  • Material and gradation. If you are working from a plan set, send us the page — it saves a conversation.
  • Quantity in tons, or the dimensions. If you have length, width and depth we will work the tonnage out. The tonnage calculator does it too.
  • Site address and access notes. Overhead wires, gate widths, soft ground, HOA windows, where exactly the pile goes.
  • When you need it. Same-day, a date, or a window against a construction programme.

Payment

First-time customers are COD or prepay for the first few loads. Once there is a clean payment history we move qualified customers onto standard credit terms with a signed credit application. We take ACH, check and major cards, and terms are confirmed at quote rather than negotiated at delivery.

On jobs where we are delivering material to real property we can preserve lien rights under Florida statute by filing a Notice to Owner within 45 days of first delivery. It protects everyone in the payment chain, and it means we get paid, which means you keep getting material on time.

Working out how much you need

Material is sold by the ton. Plans are drawn in cubic yards. That mismatch is where most ordering errors come from, and they are expensive in both directions — running short stops a crew, and over-ordering by a large margin ties up money in a pile.

The arithmetic: multiply length by width by depth in feet, divide by 27 to get cubic yards, then multiply by the material's weight per yard. Most rock runs about 1.35 to 1.4 tons per cubic yard; compacted base is heavier at roughly 1.65; topsoil is lighter at about 1.15.

Then allow for compaction. Base and fill lose roughly 20 to 25 percent of their loose volume once they are properly compacted, so the tonnage you order should be above the theoretical plan volume. Our tonnage calculator builds that allowance in and converts the answer into truckloads.

Order slightly heavy. Two extra tons in a pile costs almost nothing and always gets used. Two tons short on a Friday afternoon costs you a whole extra delivery and a crew standing around.

Sarasota — common questions

Do you really deliver as far as Sarasota?
Yes.
Is it worth it on a small order?
Honestly, sometimes not. On a single yard close to a local yard, a Sarasota supplier will usually beat us on freight. Where we win is range, specific gradations and putting several materials on one invoice.

Every material, delivered anywhere in Sarasota County

★ Ready when you are ★

Stop Babysitting Your
Material Suppliers. Call Us.

A locked quote in under an hour. Trucks on site when you need them. One invoice when the job's done.