★ Now Booking — Same-Day & Next-Day Aggregate Delivery Fort Lauderdale, FL · Jupiter to Key West
Home/Service Area/Florida Keys/Key Largo
Florida Keys County

Gravel & Rock Delivery in Key Largo

The first key, and the easiest to reach. Two routes in and the shortest haul in the chain.

Distance from yard
~90 miles
Typical lead time
Several days
County
Florida Keys
Minimum order
1 cubic yard

Key Largo runs roughly from mile marker 90 up to 107 and is the closest Keys market to the mainland at about ninety miles from our yard. It is also the only one with two ways in: US-1 through Florida City, or Card Sound Road into North Key Largo.

That second route matters more than it sounds. When US-1 has a problem — and it does — Card Sound gives us an alternative that no other island in the chain has.

Building in Key Largo

Key Largo is heavily canal-front. Large parts of the island were developed as canal communities with direct water access, which means an unusual concentration of seawall, dock and shoreline work and steady demand for rip rap and armour stone.

It also means most properties are very close to water, which is exactly what makes permitting strict. Anything touching a canal edge or below mean high water needs approvals before material arrives.

Residential construction and renovation is the other constant. Driveways, pads and slab work on properties where the ground is thin soil over hard limestone, which changes how excavation and base work behave compared with the mainland. Limerock base and crushed concrete both haul down regularly.

Landscaping leans on stone rather than lawn. Pea rock and decorative aggregate do far better than grass in Keys conditions, and they move well here.

The dive and tourism economy along the corridor generates commercial pavement and pad work, and the Ocean Reef area at the top of the island is a market of its own with its own access arrangements.

Materials we deliver to Key Largo

We carry 19 materials and will haul any of them here. These are the six Key Largo orders most, with the specification detail you need to order correctly the first time.

Limerock Base in Key Largo

The material South Florida is built on. If it is paved, there is almost certainly limerock underneath it.

Limerock is mined limestone crushed and graded so that it runs the full range from roughly three and a half inches down to powder. That full gradation is the entire point. The coarse pieces carry load, the fines fill the voids between them, and when you add water and roll it, the fines cement the whole thing into a slab you can drive a loaded truck across.

South Florida sits on limestone, which means the material is quarried locally and hauled short distances — and that is why base here costs what it costs. In most of the United States, road base is crushed granite or gravel trucked in from a distance. Here, the Miami oolite formation in Miami-Dade and the Ocala limestone further north put the quarry inside the market.

You will see it written as limerock, lime rock and crushed limestone depending on who wrote the document, and heard as base rock or DOT base on site. Engineers specify it by FDOT section number. It is all the same product.

Full Limerock Base specification, coverage figures and FAQ →

Specification

Common specificationFDOT Standard Specifications Section 911 — limerock base course
Bearing valueLBR 100 typical for base course; lower grades exist for sub-base
MaterialMined limestone — Miami oolite in Dade, Ocala formation further north
GradationWell-graded from roughly 3-1/2" down to fines — the fines are what make it bind
CompactionPlaced in lifts, typically 6" compacted, to 98% modified Proctor
Approx. weight1.65 tons per cubic yard compacted (1.4 loose)
Coverage at 4"~45 sq ft per ton compacted
Coverage at 6"~30 sq ft per ton compacted

What Key Largo customers use it for

  • Base course under asphalt roads, driveways and parking lots
  • Base under concrete slabs, aprons and sidewalks
  • Compacted base beneath paver installations
  • Structural fill and sub-base where bearing capacity is specified
  • Stabilised construction entrances and haul roads
  • Pads for equipment, containers and modular buildings

What is the difference between limerock and crushed limestone?

Nothing meaningful in this market. "Crushed limestone" is the generic description, "limerock" is the South Florida term, and FDOT documentation calls it limerock base. Same material.

Crushed Concrete in Key Largo

Recycled, cheaper than virgin rock, and it gets harder with age. The most under-rated base material in the market.

Crushed concrete is exactly what the name says: concrete from demolition, crushed and screened to a base gradation. The reflex reaction is that recycled material must be inferior to virgin rock. In this application that reflex is wrong.

Concrete never fully hydrates. There is always unreacted cement left in the matrix, and when you crush it, expose fresh surfaces, add water and compact it, that residual cement goes back to work. A crushed concrete base continues to stiffen for months after it is placed. Limerock does not do that.

It is also angular with a full range of fines, which is exactly the gradation profile that makes a good compactable base. Properly processed material performs at or very near limerock base — and costs less, because the raw input is a disposal problem somebody was paying to get rid of.

Miami-Dade in particular runs on it. The density of demolition and redevelopment in Dade means there is a lot of feedstock and a lot of processing capacity, and crushed concrete is the default base on a large share of the private work there.

Full Crushed Concrete specification, coverage figures and FAQ →

Specification

MaterialReclaimed concrete crushed and screened to a base gradation
GradationWell-graded, commonly supplied to a limerock-base-equivalent grading
ContaminantsProcessed to remove rebar, wood and trash; quality varies by producer
BehaviourResidual cement rehydrates — the layer stiffens over months
Approx. weight1.4 tons per cubic yard compacted
Coverage at 4"~54 sq ft per ton compacted
Coverage at 6"~36 sq ft per ton compacted

What Key Largo customers use it for

  • Base course under asphalt, concrete and pavers where accepted
  • Structural and general fill
  • Driveways, parking areas and yard surfaces
  • Construction entrances and haul roads
  • Pipe backfill and trench restoration
  • Levelling and grade correction on large sites

Is crushed concrete allowed as base on permitted jobs?

Often, but not universally. Many private and municipal specifications accept it; some require virgin limerock. Check the specification for your job before building on it.

Rip Rap in Key Largo

Armour stone for the places where water is actively trying to take your property back.

Rip rap is specified by class, and the class is driven by how much energy the water carries. Sheltered canal banks in inland Broward take smaller stone than an exposed shoreline on the ocean side of the Keys, and a scour apron at a culvert outfall is sized for the velocity coming out of the pipe.

The general rule is that stone has to be heavy enough that design-storm flow cannot move it, and graded enough that smaller pieces fill the voids between larger ones so the mat locks up rather than acting as a pile of loose boulders. Almost every properly built installation also has a filter layer underneath — geotextile fabric, a bedding stone course, or both — to stop the soil beneath from washing out through the gaps. Rip rap placed directly on sand will eventually sink into it.

We are the supplier, not the engineer. If your project is permitted, the plan set will name the class and the layer thicknesses; send us that page and we will match it. If it is unpermitted seawall repair on your own property, tell us the exposure and we will tell you honestly what size the neighbours are using.

Full Rip Rap specification, coverage figures and FAQ →

Specification

Common classesBedding stone, rubble rip rap, bank-and-shore rip rap
Size rangeRoughly 6" to 36" depending on class and exposure
MaterialQuarried limestone; occasionally recycled concrete rubble where permitted
ShapeAngular, blocky — interlocks and resists rolling
Approx. weight1.4 tons per cubic yard placed
Filter layerGeotextile or bedding stone almost always required beneath

What Key Largo customers use it for

  • Seawall toe protection and scour aprons
  • Shoreline and canal bank armouring
  • Slope stabilisation on retention ponds and lake banks
  • Culvert and outfall headwall protection
  • Living shoreline and mangrove edge stabilisation projects
  • Temporary construction entrances and haul road crossings

Do I need a permit to put rip rap on my seawall?

Almost certainly, if any part of the work sits below the mean high water line. Depending on location that can involve FDEP, the South Florida Water Management District, the Army Corps of Engineers and a local marine permit. Confirm before ordering material.

Fill Dirt in Key Largo

Bulk soil for moving grade. Cheap by the ton, and the material most often ordered in the wrong quantity.

Fill dirt is screened soil sold by the ton for moving volume. The word that matters is clean: no roots, no construction debris, no trash, no significant organic content. Organic material rots, and soil with organics in it keeps settling for years after you thought the job was finished.

Where a specification calls for structural fill, the requirements are tighter — a specified gradation and a compaction standard, usually verified by a testing lab. If your drawing says structural fill, tell us, because that is a different order from generic clean fill.

For most residential and light-commercial work — raising a low corner of a yard, building a pad, backfilling an old pool — clean fill is what you want and what we deliver.

Full Fill Dirt specification, coverage figures and FAQ →

Specification

MaterialScreened soil, free of debris, roots, trash and organics
Grades"Clean fill" for general use; "structural fill" where bearing is specified
CompactionPlace in lifts, water, compact — do not dump and leave
Approx. weight1.25 tons per cubic yard
Coverage at 6"~39 sq ft per ton
Coverage at 12"~19 sq ft per ton

What Key Largo customers use it for

  • Raising lot grade and correcting low spots
  • Building up pads before base and slab work
  • Backfilling excavations and old pool removals
  • Landscape berms, mounds and contouring
  • Filling behind retaining walls and seawalls
  • General bulk volume where bearing is not critical

How many tons of fill dirt do I need?

Work out cubic yards (length × width × depth in feet, divided by 27), multiply by about 1.25 to get tons, then add 15 to 25 percent for compaction. Our tonnage calculator does this and converts to truckloads.

Pea Rock in Key Largo

Small, rounded and smooth underfoot. Called pea gravel everywhere else — in Florida it is pea rock.

Same material, different vocabulary. The rest of the country calls it pea gravel; South Florida calls it pea rock, and if you ask a yard here for pea gravel you will get a slight pause before they hand you the same thing.

It is a small, naturally rounded stone at about three-eighths of an inch nominal, washed clean, in a mix of tans, greys and off-whites. The rounded shape is what distinguishes it from #89 rock, which is a similar size but crushed and angular.

That difference drives where each one is used. Rounded feels good underfoot and looks softer, so pea rock goes on pool decks, paths and decorative areas. Angular locks under load, so #89 goes under pavers and around pipe.

Full Pea Rock specification, coverage figures and FAQ →

Specification

Nominal size3/8 inch
ShapeRounded and water-worn, not crushed
WashedYes
ColourMixed tans, greys and whites depending on source
Approx. weight1.4 tons per cubic yard
Coverage at 2"~105 sq ft per ton
Coverage at 3"~70 sq ft per ton

What Key Largo customers use it for

  • Pool deck surrounds and landscape borders
  • Walkways, paths and courtyard surfaces
  • Drainage beds and dry creek features
  • Playground surfacing
  • Exposed aggregate concrete finishes
  • Ground cover in planting beds and side yards
  • Under decks and in side-yard drainage runs

Is pea rock the same as pea gravel?

Yes. "Pea gravel" is the national term and "pea rock" is what it is called in South Florida. Same 3/8-inch rounded washed stone.

#57 Rock in Key Largo

The workhorse drainage stone of South Florida. Open-graded, angular, and the default answer whenever water has to move through rock instead of sitting on it.

#57 is a gradation, not a rock type. The number comes from the AASHTO/ASTM sizing chart, and it describes stone that passes a 1-1/2 inch sieve and is retained on a No. 4 — in practice, pieces running roughly three-quarters of an inch to an inch, with the fines washed out.

In most of the country #57 is granite or trap rock. In South Florida it is crushed limestone, quarried locally, which is why it costs a fraction of what the same gradation costs in Georgia and why nearly every drainage detail on a Broward or Miami-Dade plan set specifies it. You will hear it called #57 stone by engineers and spec writers and 57 rock by everyone actually standing on the job. Same material.

The defining property is what has been removed. Because the fines are washed out, the stone will not knit together and will not compact. Stack it and it stays a pile of loose angular rock with roughly a third of its volume as open void. That void is the whole point: water runs straight through it instead of perching on top.

Full #57 Rock specification, coverage figures and FAQ →

Specification

GradationAASHTO / ASTM No. 57 — passes 1-1/2", retained on No. 4 sieve
MaterialCrushed limestone (South Florida oolite or Ocala formation)
ShapeAngular, crushed faces
WashedYes — minimal fines
DrainageFree-draining; roughly 30–40% void space
CompactionDoes not compact — consolidates only, no proctor spec
Approx. weight1.35 tons per cubic yard (2,700 lb)
Coverage at 2"~110 sq ft per ton
Coverage at 4"~55 sq ft per ton

What Key Largo customers use it for

  • French drains and trench drains — the standard backfill stone
  • Septic drainfields and pump chambers
  • Under-slab drainage layer beneath concrete
  • Pipe bedding and backfill where flow matters more than support
  • Coarse aggregate in ready-mix concrete
  • Loose driveways and equipment pads where mud is the enemy
  • Erosion control at downspouts and swale outfalls

Is #57 stone the same as #57 rock?

Yes. "Stone" is the term on plan sets and in ASTM/AASHTO documentation; "rock" is what it is called on job sites throughout South Florida. Both refer to the same washed, open-graded gradation running roughly 3/4" to 1".

Choosing the right material

Most ordering mistakes are not quantity errors — they are the wrong material bought for the job. This is the short version of what goes where.

If the job is…UseNotWhy
Base under pavement, inspectedLimerock baseShell rockSpec work needs the certified bearing value. Shell rock will not satisfy LBR 100.
Base under pavement, not inspectedCrushed concreteVirgin limerockPerforms at or near limerock, gains strength over time, costs less.
Driveway, pad or ranch roadShell rockSpec limerockNobody is testing the bearing value. Put the saving into thickness.
Driveway wearing surfaceAsphalt millingsLoose stoneBinds in the sun into a firm dark surface that does not wash out or dust.
French drain or drainfield#57 rockCrusher runWashed and open-graded, so water moves through it. Anything with fines clogs.
Under pavers — beddingWashed concrete sandMason sand or stone dustOnly well-graded coarse sand locks under load. One inch, screeded.
Permeable paver bedding#89 rockConcrete sandPermeable systems are a different detail — open-graded stone, not sand.
Mortar, play areasMason sandConcrete sandFine and uniform, so it trowels smoothly and is soft underfoot.
Raising grade under a slabFill sandFill dirtDrains freely and compacts predictably. Dirt holds moisture and moves.
Landscape grade, bermsFill dirtFill sandCheaper per ton, and bearing capacity is not the concern.
Under new sodTopsoilFill dirtFill is deliberately low in organics. Sod on fill declines once it exhausts what it arrived with.
Pool deck, path, bordersPea rock#57 rockRounded and smooth underfoot. Angular stone is uncomfortable and looks harsh.
Seawall, shoreline, scourRip rapAnything smallerStone has to be heavy enough that design-storm flow cannot move it.

Not sure? Call and describe the job. We would rather spend two minutes on the phone than deliver the wrong thing.

Ground conditions in the Florida Keys

The Keys are geologically unlike anywhere on the mainland, and building here reflects that at every turn.

Rock, not soil

The upper Keys are built on Key Largo Limestone — fossil coral reef — and the lower Keys largely on Miami oolite. Either way, what sits under your feet is rock with a very thin and often nonexistent soil cap.

That means excavation is breaking, not digging. It means anything requiring depth costs more than the mainland equivalent. And it means that when a job calls for soil, planting medium or fill, all of it has to be imported — there is nothing local to win it from.

No aggregate production at all

There are no quarries, no pits and no processing anywhere in the island chain. Every ton of base, fill, sand and stone used between Key Largo and Key West is hauled down US-1 from the mainland. That is the single dominant economic fact of construction here, and it is why material costs more the further down the chain you go.

Elevation, flooding and why fill is regulated

The islands are very low. Much of the developed area sits only a few feet above sea level, and essentially all of it is within flood zones. Adding fill changes drainage patterns on neighbouring property and alters flood behaviour, which is precisely why Monroe County scrutinises fill placement and grade changes far more closely than any mainland county in our service area.

Do not order fill for a Keys job until the permitting is settled. It is a long way to send material that cannot legally be placed.

Salt, storms and material choice

Everything here is exposed to salt air and periodically to storm surge. Shoreline protection is not a one-time improvement but an ongoing maintenance obligation, which is why rip rap and armour stone move in the quantities they do.

Getting a truck onto your Key Largo site

Two routes is a genuine advantage. Card Sound Road is a toll road into North Key Largo and gives us a way around problems on the US-1 approach through Florida City.

Once on the island, US-1 through Key Largo is the spine and most properties come off it directly or through short canal-community streets. Those streets are often narrow with limited turning room, and canal-front lots frequently have restricted frontage.

Tell us whether the truck can reach the drop point or whether the material needs staging and moving by machine. On seawall work particularly, getting a loaded tri-axle close enough to the water to place stone where you want it is often not possible.

Plan on several days of notice. Key Largo is the most schedulable Keys market but it is still a ninety-mile haul each way.

Timing the work around the weather

South Florida has two seasons that matter to anyone moving material, and planning around them is worth real money.

Wet season, roughly May to October

Afternoon storms are close to daily and they are heavy. Three practical consequences:

  • Ground goes soft fast. A site that carried a loaded truck on Monday may not on Wednesday. A tri-axle raising its bed puts enormous load through the rear axles, and we would far rather drop on firm ground near the road than bury a truck on your lot.
  • Compaction gets harder. Base and fill compact best at near optimum moisture. Saturated material pumps under a roller instead of densifying, and no amount of extra passes fixes it.
  • Uncovered piles absorb water. Topsoil and fine sand are worst affected — a soaked pile is significantly harder to spread. Tarp anything that will sit more than a day or two.

Dry season, roughly November to April

Better ground, easier compaction, and the busiest construction period of the year — which means pits and trucking are in higher demand and lead times stretch. Book earlier than you would in August.

The exception is asphalt millings, which want heat. Millings laid and rolled in June bind within days; the same load in January can take weeks and may need re-rolling.

Hurricane season, June through November

Two effects. Before a storm, demand for rip rap and shoreline protection spikes and everything gets tight. Afterwards, cleanup and repair work absorbs regional trucking capacity for weeks.

If your project involves shoreline protection, do it in the spring. Trying to armour a seawall with a named storm in the forecast is how people end up paying premium rates for whatever stone is left.

Working out how much you need

Material is sold by the ton. Plans are drawn in cubic yards. That mismatch is where most ordering errors come from, and they are expensive in both directions — running short stops a crew, and over-ordering by a large margin ties up money in a pile.

The arithmetic: multiply length by width by depth in feet, divide by 27 to get cubic yards, then multiply by the material's weight per yard. Most rock runs about 1.35 to 1.4 tons per cubic yard; compacted base is heavier at roughly 1.65; topsoil is lighter at about 1.15.

Then allow for compaction. Base and fill lose roughly 20 to 25 percent of their loose volume once they are properly compacted, so the tonnage you order should be above the theoretical plan volume. Our tonnage calculator builds that allowance in and converts the answer into truckloads.

Order slightly heavy. Two extra tons in a pile costs almost nothing and always gets used. Two tons short on a Friday afternoon costs you a whole extra delivery and a crew standing around.

How ordering works

There is no account to open and no portal to log into. You tell us the material, the tonnage, the site address and when you need it on the ground, and we come back with a locked, all-in delivered price — usually within the hour during business hours.

That price includes the haul. We quote delivered, not ex-pit, so the number we give you is the number on the invoice. If you are comparing quotes, check whether the other one has trucking in it.

What we need from you

  • Material and gradation. If you are working from a plan set, send us the page — it saves a conversation.
  • Quantity in tons, or the dimensions. If you have length, width and depth we will work the tonnage out. The tonnage calculator does it too.
  • Site address and access notes. Overhead wires, gate widths, soft ground, HOA windows, where exactly the pile goes.
  • When you need it. Same-day, a date, or a window against a construction programme.

Payment

First-time customers are COD or prepay for the first few loads. Once there is a clean payment history we move qualified customers onto standard credit terms with a signed credit application. We take ACH, check and major cards, and terms are confirmed at quote rather than negotiated at delivery.

On jobs where we are delivering material to real property we can preserve lien rights under Florida statute by filing a Notice to Owner within 45 days of first delivery. It protects everyone in the payment chain, and it means we get paid, which means you keep getting material on time.

Areas we cover in Key Largo

Key Largo, North Key Largo, Tavernier border, Rock Harbor, Newport, Ocean Reef area, the Card Sound Road corridor and mile markers 90 through 107.

If your street is not on that list, we still deliver there — it is not an exhaustive index, just the areas we are asked about most.

Key Largo — common questions

How long does a Key Largo delivery take to arrange?
Several days is realistic. It is the closest Keys market and the only one with two routes in, which makes it the most reliable to schedule — but it is still ninety miles each way.
Can you use Card Sound Road?
Yes, and it is genuinely useful. It gives access into North Key Largo independent of the US-1 approach, which matters when the highway has problems.
Do I need a permit for seawall work in Key Largo?
Almost certainly. Canal-front and shoreline work in Monroe County typically involves county approval plus FDEP and often the Army Corps. Confirm before ordering stone.

Florida Keys County — general questions

Do you really deliver to the Florida Keys?
Yes, the full length of US-1 to Key West. Our old site said Monroe County was served "by request" — that undersold it. The Keys are a regular corridor for us.
How much lead time do you need for a Keys delivery?
More than the mainland. Give us several days where you can, and a week for larger jobs. US-1 is two lanes with no alternative route, so we plan these runs rather than squeezing them in.
Are there quarries in the Keys?
No. There is no aggregate production anywhere in the island chain. Every ton of gravel, rock, sand, base and fill used in the Keys is hauled down from the mainland.
Do I need a permit to bring in fill?
Very likely. Monroe County regulates fill placement, grade changes and shoreline work tightly, and FDEP and the Army Corps are frequently involved. Confirm approvals before ordering material.
Can you haul debris back to the mainland?
Yes — clean concrete, asphalt, fill and dirt to permitted mainland yards. Given how difficult disposal is in the Keys, combining a delivery with a backhaul is often the most economical way to handle both.

Nearby cities we also serve

All of the Florida Keys → · Full service area →

★ Ready when you are ★

Stop Babysitting Your
Material Suppliers. Call Us.

Material on site in Key Largo when you need it, at a price that was locked before the truck left.